Overview
A monument sign is the first impression for any business with frontage. Total Signs designs around your setback, sight lines, and brand standards, then handles concrete foundations, electrical stub-up, and lighted cabinet or routed-letter faces. We work alongside landscape architects and general contractors when needed.
- Stucco, brick, stone-veneer, and aluminum monument structures
- Internally illuminated cabinets or push-thru acrylic letters
- Engineered foundation drawings sealed by a Texas PE
- Tenant directory and multi-tenant configurations
- Variable message displays and LED address numerals
Typical timeline
Plan on 8–12 weeks from kickoff to install: 2–3 weeks for design and engineering, 4–6 weeks for permits and foundation, 1–2 weeks for fabrication, and a one to two day install.
Frequently asked
Who pulls the permit for a monument sign?
Total Signs handles the permit submission, including engineered drawings and electrical stub-up coordination with your contractor or landlord.
Can you re-face an existing monument?
Yes — re-skinning an existing monument is often the fastest way to refresh a property. We swap faces, vinyl, or LED retrofits without touching the foundation.